Manser Saxon

Project Description

INTERVENTION AT MIDLAND DAM

The works consisted of the Replacement of a DN 1800 butterfly valve. This has been achieved after dismantling of steel platforms and removal of associated pipe spool piece. Moreover, a stop-log was installed inside the dam after removal of the bottom trash rack to prevent water ingress in the valve chamber

Project Details

Skills Needed:

Categories: